{"id":988313,"date":"2026-09-01T12:00:00","date_gmt":"2026-09-01T12:00:00","guid":{"rendered":"https:\/\/croncodestudio.com\/en\/?post_type=croncode_post&#038;p=988313"},"modified":"2026-08-31T18:57:30","modified_gmt":"2026-08-31T18:57:30","slug":"from-idea-to-market-how-agile-product-teams-overcome-time-to-market-bottlenecks","status":"publish","type":"croncode_post","link":"https:\/\/croncodestudio.com\/en\/journal\/from-idea-to-market-how-agile-product-teams-overcome-time-to-market-bottlenecks\/","title":{"rendered":"From Idea to Market\u00a0&#8211; How Agile Product Teams Overcome Time-to-Market Bottlenecks\u00a0"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<p class=\"wp-block-paragraph\">Most groups attribute delays in launching new products or features to development. This is often a misguided&nbsp; attribution. By the point at which a feature gets onto a sprint board, much damage has already occurred. The&nbsp; damage only crops up when the deadline fails and someone then inquires why the engineering team needed so&nbsp; long.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Where the time actually gets lost is in the earliest phases of development: in the case of specifications that have&nbsp; undergone the rewriting process two times before the writing team starts programming and design handoffs that&nbsp; have been lying unattended in someone&#8217;s inbox for weeks, as well as quality control processes that kick off only&nbsp;&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">after the development has been completed. All of this does have a negative impact on the launch date of a&nbsp; project.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The answer for all of this is dual-track agile development. This means that discovery and execution should&nbsp; happen at the same time rather than subsequent to each other, but for many teams this solution remains far from&nbsp; obvious.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In croncode, a number of apps such as Numira, YourStyle, and Spylie are running simultaneously and&nbsp; consequently, the situation calls for a certain level of organization. A product team can afford to have its work&nbsp; done sequentially because the focus is on the same set of people and no other project needs to benefit from their&nbsp; attention. However, this does not help teams that work on multiple products. If the design team spends a week&nbsp; on completing the tasks for one particular product, the team responsible for the second product will not be able&nbsp; to benefit from this attention during this week. This can be achieved only with the help of understanding who is&nbsp; responsible for which product and being able to coordinate collaboratio in such a way that the responsibilities&nbsp; are clear enough, but at the same time there is no need to create any complicated organizations of the processes&nbsp; taking place.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The trade-off that people often shy away from discussing is speed versus technical debt. Getting new products to&nbsp; market quickly implies taking shortcuts, which will ultimately add up. However, companies that are able to&nbsp; maintain that speed over the long term are not the ones who continually cut corners &#8211; they are the ones who&nbsp; make paying off technical debt part of their business strategy, rather than something they are surprised by and&nbsp; completes a massive rewrite in 18 months.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A surprisingly simple way to determine what work should happen first is to actually ask the question &#8211; does this&nbsp; work remove a blockage, or does it create a new decision further down the line? Use this simple guide, because&nbsp; work that removes a blockage stops everything else from happening.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n<\/div><!-- .vgblk-rw-wrapper -->","protected":false},"excerpt":{"rendered":"<p>Most groups attribute delays in launching new products or features to development. This is often a misguided&nbsp; attribution. By the point at which a feature gets onto a sprint board, much damage has already occurred. The&nbsp; damage only crops up when the deadline fails and someone then inquires why the engineering team needed so&nbsp; long.&nbsp;&#8230;<\/p>\n","protected":false},"featured_media":988314,"template":"","croncode_category":[46,48],"croncode_author":[47],"class_list":["post-988313","croncode_post","type-croncode_post","status-publish","has-post-thumbnail","hentry","croncode_category-blog","croncode_category-studio","croncode_author-yusufhan-sokur"],"_links":{"self":[{"href":"https:\/\/croncodestudio.com\/en\/wp-json\/wp\/v2\/croncode_post\/988313","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/croncodestudio.com\/en\/wp-json\/wp\/v2\/croncode_post"}],"about":[{"href":"https:\/\/croncodestudio.com\/en\/wp-json\/wp\/v2\/types\/croncode_post"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/croncodestudio.com\/en\/wp-json\/wp\/v2\/media\/988314"}],"wp:attachment":[{"href":"https:\/\/croncodestudio.com\/en\/wp-json\/wp\/v2\/media?parent=988313"}],"wp:term":[{"taxonomy":"croncode_category","embeddable":true,"href":"https:\/\/croncodestudio.com\/en\/wp-json\/wp\/v2\/croncode_category?post=988313"},{"taxonomy":"croncode_author","embeddable":true,"href":"https:\/\/croncodestudio.com\/en\/wp-json\/wp\/v2\/croncode_author?post=988313"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}